Repairs
Business IT
Starlink
Home
Call 1300 224 027Book a repair

Open 7 days, 9 am to 8 pm

Business IT

Office move IT checklist: a 12-week timeline to day one

A week-by-week IT plan for moving a small business office, from ordering NBN or fibre 12 weeks out to cabling, Wi-Fi, printers, phone porting, the cut-over weekend and the checks to run before staff arrive on day one.

  • 5 min read
Open 7 days, 9 am to 8 pm
“Prompt, professional, and very helpful. Highly recommend.”
CHRISTINE F., Google review
An office mid-move: monitors wrapped in bubble wrap, crates of cables and keyboards, a network switch on a trolley, empty desks and moving boxes

Key takeaways

  • Order internet first. NBN and fibre services at a new address can take weeks or months, especially if building work is needed.
  • Cabling must be installed by a registered cabler, so book one early and plan data points against your floor plan.
  • A Wi-Fi survey before fit-out puts access points where people actually work, not just where the ceiling is easiest.
  • Phone porting, scan-to-email and services locked to your old IP address are the usual day-one surprises. Plan them weeks ahead.

Day-one problems and what usually causes them

Most day-one faults are small and predictable. Here's how we read them on the morning after a move.

What you noticeLikely causeThe fix
What you noticeCopier won't scan to emailLikely causeStored password blocked by Microsoft 365, or connector locked to the old IPThe fixUpdate the connector's IP or move to OAuth or an SMTP relay
What you noticeBank or software portal refuses accessLikely causeAllow-list still holds the old public IPThe fixSend providers the new static IP before day one
What you noticeCalls ring the wrong phonesLikely causePort completed, but extensions and groups not updatedThe fixRe-map extensions and hunt groups, then test every number
What you noticeWi-Fi drops between roomsLikely causeToo few access points, or poor roaming settingsThe fixWalk-test coverage, then add or move access points
What you noticeMeeting room screen won't castLikely causeGuest and staff networks isolated from each otherThe fixAllow casting across networks, or use a wired input
What you noticeInternet down and the backup never kicked inLikely causeFailover not configured, or the SIM never activatedThe fixTest failover by unplugging the main connection
What you noticeCameras record but can't be viewed remotelyLikely causeRecorder still set up for the old networkThe fixSet up remote viewing again, without port forwarding

Not sure which one it is? Send us the symptoms and we’ll tell you before you travel.

Talk to us about your IT

Leave your number. We call back during opening hours to book your free IT review, or just to answer questions.

We only use your number to call you about this.

a sensible minimum lead time for a small office move
12 weeks
data points as a common minimum, plus printers, APs and spares
2 per desk
to keep the old internet service live after the move
1 week+
Microsoft 365 turns basic SMTP AUTH off by default
End Dec 2026

Why the IT is the hard part of an office move

Removalists move a desk in minutes, but internet, cabling, Wi-Fi, phones that ring at the right desks and printers that scan to the right place need months.

When day one goes wrong, one of these was usually left too late.

The six things that break on day one

Desks and chairs rarely cause trouble. These do, and every one of them can be planned weeks ahead.

  • Phone numbers

    A port requested late lands after the move. Start it about six weeks out and book it for the business day before the move.

  • Scan to email

    Copiers that send through Microsoft 365 with a stored password, or a connector locked to your old IP address, stop on the new network.

  • IP allow-lists

    Banking platforms, licence servers, remote access and Conditional Access rules that only trust your old public IP address.

  • Wi-Fi dead spots

    Glass meeting rooms, lift cores and brick walls nobody surveyed, with access points placed to suit the ceiling grid rather than the people.

  • Alarms, doors and cameras

    Monitoring, door access and CCTV need their own installers, network ports and often a new account with the provider.

  • Untested failover

    A 4G or 5G backup that's plugged in but has never been tested by pulling out the main connection.

12 weeks out: internet and the building

Internet is the longest lead item, so it comes first. Do these this week.

  1. Check the new address. NBN type, business fibre, and whether a new building is actually connected despite a finished fit-out.
  2. Order the main connection. Business NBN at a connected address can be quick. Enterprise fibre or new cabling into the building can take months with civil works or landlord approvals.
  3. Order a backup. 4G or 5G on a dual-WAN router covers you if the main connection isn’t ready.
  4. Ask about the building. The comms room, risers, landlord approval for cabling, wall penetrations or roof equipment, and after-hours keys.
  5. Read the lease. Who owns existing cabling, what you must remove when leaving, and limits on antennas or dishes.
  6. List what depends on the office. Phone lines, alarms, door access, CCTV, printers, servers and services locked to your office IP address.

Internet options for the new office

Order the main service as soon as the lease is signed, and a backup that can be live within days in case the main one runs late.

Swipe to compare

Business NBNEnterprise fibre4G or 5G failoverStarlink backup
Typical lead timeDays to weeks, if the address is connectedSeveral weeks to monthsDaysDays, plus a mount
SpeedsDepend on the connection typeSymmetrical, set by contractVary with signalVary with sky view
Installs without building worksUsuallyRarelyPartial
Good as the main connectionRural sites
Static IP for allow-listsUsually, on requestRarelyRarely
Best forMost offices of 5 to 50 staffLarge uploads, several sites, contracted service levelsDay-one cover if the main service is lateRural offices, sheds and weak mobile areas

Ask every provider, in writing, for the installation date and whether a static IP address is included. A Starlink dish on a leased building needs the landlord's approval.

8 to 11 weeks out: cabling, power and Wi-Fi

Plan every data point on the floor plan. Two per desk is the common minimum, plus printers, access points, cameras, screens, door access and spares.

  • Book a registered cabler. Get registration details, a quote listing every run and test results. Cat6 is the usual minimum; consider Cat6A for access points: network cabling.
  • Plan the comms cupboard. Power, ventilation and a lock: a UPS and switches with no airflow in a Canberra summer age fast.
  • Coordinate the electrician with the cabler, from the same floor plan.
  • Survey the Wi-Fi. Predictive, then on site once walls are up, to place business access points around concrete, glass meeting rooms and lift shafts.
  • Design the network. Separate networks for staff, guests, phones, printers and cameras, and a proper business firewall instead of the consumer router.
  • Order hardware now. Gear can take weeks; device procurement sources it.
Office floor plan with desks, a meeting room, the comms cupboard and ceiling Wi-Fi access points
Plan data points, the comms cupboard and access points on the same floor plan your cabler and electrician use.

6 to 7 weeks out: phones, printers and providers

Phones, copiers and security systems each have their own provider and lead time, so start them now.

  • Number port

    Book it through your new provider for the Friday before the move, as ports complete in business hours. Number ranges and 1300 numbers take longer.

  • Printer-copier

    Leased copiers often need the leasing company’s technicians. Move scan-to-email to OAuth or a secured SMTP relay before the move.

  • Security and IP-locked services

    Alarm, door access and CCTV providers plan their own moves; our business CCTV team can install cameras at the new site. Banks, some government portals, licence servers and remote access tools need your new IP address; ask your provider early if it will be static.

    Warning: A move near the end of December 2026 can break scanning twice: once when the new IP locks the copier out of its Microsoft 365 connector, and again when Microsoft switches off basic SMTP AUTH.

Keeping your phone numbers through the move

How much planning the phones need depends on where your numbers live today.

Swipe to compare

Port to a new serviceCloud phone systemMicrosoft Teams Phone
Numbers move without a portYes, if you're already on itYes, if you're already on it
Rings on the new network on day oneOnce the port completes
Staff can answer from homePartial
HandsetsExisting or newIP handsets or an appTeams-compatible handsets or the Teams app
What to book aheadThe port date; longer for 1300 numbers and rangesNetwork ports and power for handsetsLicences and a calling plan, then the port
Best forStaying on a traditional serviceTeams who move between sites or work from homeOffices already working in Microsoft 365

Moving to a new phone system at the same time as the office doubles the risk. If you can, change one first and the other a few weeks later.

2 to 5 weeks out: confirm, document and test

The comms cupboard at the old office: unlabelled cables and a consumer router, the usual starting point.
The comms cupboard at the old office: unlabelled cables and a consumer router, the usual starting point.

Chase the internet and cabling dates, and confirm cut-over with every contractor and provider. Update your website, Google Business Profile, signatures and invoices.

Write the move plan, including the rollback if the new internet fails. Gather admin passwords for the firewall, switches, Wi-Fi, phones and printers, and back up anything stored only locally.

Once the site is ready

  • Cabling test results received
  • Internet and failover tested
  • Comms rack labelled to the floor plan
  • Wi-Fi coverage walked in every room
  • IP allow-lists updated for Microsoft 365 or Google Workspace, remote access and firewall
  • One desk tested end to end, including a video meeting

The cut-over weekend

In the final week, label every computer, monitor, dock and phone with its new desk, check full backups, and pack spare cables and power boards.

  • Friday afternoon

    Confirm final backups, shut everything down properly, and pack the network equipment last, labelling every cable that matters.

  • Saturday

    Network first: firewall, switches, UPS and servers. Confirm internet, failover and remote access, set up desks and printers, then test calls once the port completes.

  • Sunday

    Test every desk, meeting room, camera, door, alarm and backup. If something critical isn’t working, decide by Sunday afternoon whether to roll back to failover or have staff work from home on Monday.

Day one, and the premises you're leaving

Have a technician on site first thing. Most issues are small, and fixing them in the first hour sets the tone for the week.

Check sign-in, email, files, scanning, caller ID and failover both ways, and keep a problem log. Over the next fortnight, close the log and check patching, backups and security settings carried across. Keep the old internet live for at least a week, then cancel it with anything else billed to the old address.

At the old premises

  • Wipe drives in computers, servers, NAS and copiers; many copiers store scans
  • Return leased equipment, including provider routers
  • Leave the NBN connection box: it belongs to NBN Co
  • Complete make-good, which may mean removing your cabling
  • Collect keys and change door or alarm codes

Getting help with your move

In pictures

Common questions

Still stuck? Call 1300 224 027, 9 am to 8 pm, 7 days.

How early should we start planning the IT for an office move?

Twelve weeks is a sensible minimum for a small office, and longer if you need fibre, the building is new or there's significant fit-out. Internet orders and cabling are the long lead items, so start on those as soon as the lease is signed.

Can we take our NBN connection with us?

Not as such. Your service is tied to the address, so the new premises need their own connection, even if you stay with the same provider. Order it early and keep the old service running until the move is finished.

Do we need a registered cabler?

Yes. Under ACMA's rules, telecommunications cabling, including the data cabling in an office, must be installed by a registered cabler. Ask for their registration details, and for test results for every cable run when the job is done.

Will our phone numbers move with us?

Usually. Local 02 numbers can be ported to a new service as long as the new office is in the same number area, which a move within Canberra normally is, and 1300 numbers aren't tied to a location at all. If you're already on a cloud phone system or Microsoft Teams Phone, your numbers aren't tied to the building. Either way, start any port well ahead and book it for just before the move.

Why might our scanner stop emailing after the move?

Usually one of two reasons. The copier signs in to Microsoft 365 with a stored username and password (basic SMTP AUTH), which Microsoft turns off by default at the end of December 2026, or it sends through a connector that only accepts your old office IP address. Both are fixable, so test scanning at the new site while there's still a few weeks to go.

When's the right time to move the IT?

Usually over a weekend: pack down on Friday afternoon, set up and test on Saturday and Sunday, and have a technician on site on Monday morning. Avoid your busiest period, the end of the month and the days just before a major deadline.

What should we do with old equipment we're not taking?

Wipe or destroy the drives first, then recycle or sell the hardware. Return leased equipment to the lessor, and leave the NBN connection box on the wall, because it belongs to NBN Co. We can wipe drives securely and give you a record of what was done.

How many data points does each desk need?

Two per desk is a common minimum, plus points for printers, access points, cameras, meeting room screens and spares. Extra points are much easier and cheaper to install during the fit-out than after it.

Reviews from TechBox customers

Real Google reviews.

Duvi was great. Identified and resolved the problem with our computer quickly, and arranged the necessary repairs. Delighted with the outcome.

ruth d., Google review

Excellent professional service- very prompt home visit, quick diagnosis of my computer problem and then it was fixed and returned to my house next day. I will certainly use this company again.

ironbark v., Google review

Duvi was excellent, very quick to identify my needs and to fix issues. Very Knowledgeable about Apple and Macintosh products . A very smart and focussed technician . I am very happy with his serviced happy to recommend him to anyone whinnied tech help.

Steve P., Google review

Book a free IT review

We look at your devices, accounts, backups and security, then give you a plain-English plan and a fixed quote.

1300 224 027

Calls answered 9 am to 8 pm, 7 days.

  • Free and no obligation
  • Written plan and a fixed monthly quote
  • Repairs done in our Mitchell workshop
“Very personable and professional attention to the problem. Would use again.”
Paula K., Google review

Book a free IT review

A 30-minute look at your devices, accounts, backups and security, with a written plan.

IT reviewTB-·····

How many people?
What do you need?

What happens next

  1. We call you back during opening hours to book a time.
  2. About 30 minutes on-site or remotely, with someone who knows your setup.
  3. You get a written summary and, if you want it, a fixed monthly quote.

Open 7 days, 9 am to 8 pm
Prefer to talk? Call 1300 224 027. We only use your details to answer this request.

Open 7 days, 9 am to 8 pm

Call nowBook online